Timing ourselves on each job we do does provide incredible insights into how our lawn mowing business is operating. It tells us our hourly rates on every job. It compares our jobs between each other. It helps us to understand our own pricing better. It shows us our weaknesses, and our strengths. It shows us where to improve. It is a financial snapshot of how our lawn mowing round is performing financially as we are on the ground and doing the work.

We are taking the pulse of our business as its heart is beating.

I believe that this is an incredible tool for everyone in the lawn mowing industry to use at various points in their business life. It tells us the truth like nothing else can. It cuts through our delusions, our assumptions, our biases, our losing track of time on any given job. It takes our merry work day and turns it on its head and slaps us with cold hard truth of the absolute reality of how we are earning financially within our lawn mowing business, on the ground, from job to job.

How To Time Our Work

The way to time our work is twofold.

First we take note of the time we leave home in the morning, and then the time that we finish the last job at the end of the day. This gives us our hourly rate, including drive time.

I personally don’t time when I arrive home, but when I finish the last job, because everyone has to travel to and from work, and no one gets paid for it. To try to pay ourselves for driving to and from work gives an incorrect hourly rate. Some people might want to time themselves from when they arrive at the first job, but I choose not to, because we must still take into account the time it takes to get to that first job as if it were the second job. We are after all accounting for drive time between jobs here. I choose to leave off the drive home because I’m not driving to another job, so I believe an incorrect hourly rate would be gotten by doing so.

Second we want to take note of the time that we get out of the vehicle to start work at every job we do. Then we take note of the time we get back into the vehicle when we have completed that job. This gives us our hourly rate at every single job we do.

I use a work diary to schedule all of my work, so I write the times in this diary.

Collating This Data

The hourly rate with drive time is a curiosity, and not something we need to focus on as any priority. Though we will want to see these numbers improve as we make changes to our business operations.

The changes to our lawn mowing business come from improvements to our hourly rates on each job we do, which will then reflect back to the hourly rate we achieve with drive time.

We can improve our hourly rate with drive time by compacting our lawn mowing rounds more, by removing any distant jobs that we have. This too will drastically improve our hourly rates with drive time, though it is outside the context of this article.

We would collate our data each day at home, or on the weekend. We would divide the price for the job by the minutes the work took to complete, then times that number by 60. This gives us cold hard truth from job to job how our round is doing.

The moment we begin doing this, we will be shocked by how we have so many big variations in our hourly rates between different jobs. But we don’t want to get too worried about anything just yet.

Ideally we would want to time each job about 3 times to average out any variables which might alter the time it took to complete any job on any given day. This will give us our truer figure from which to work from to understand our work, and then to work on improvements.

Using This Data To Improve Our Efficiency

First we will soon discover what our ideal hourly rate is for the work we do. The data will tell us what is best, what is average, and what is below par. This is our first valuable insight.

What we will instantly discover when we begin to interpret this data is that if certain jobs are well below the average of our other work, that the problem might not necessarily be due to it being an underpriced job. We will ask ourselves when we see the data for the under performing jobs whether this is due to an error in pricing, and can we ask more for this same job with a price increase.

On some jobs though the price we charge is pretty much spot on. What we then discover is that there is something else about the job that is causing it to take longer to complete than it should. This might be due to:

  • strange layout of the lawn
  • lawn is in multiple sections
  • we need to go down a long pathway with each piece of equipment
  • lawns require two different lawn mowers
  • lawns need to be cleared of toys before mowing
  • we need to park in the back lane for the back lawn and in the street for the front lawn
  • there is twice as much edging to do as is usual for this lawn size
  • we are simply making errors in the way me mow these lawns which then causes us to take much longer to complete the work

From all of these factors that we now look into, we begin to see all of the ways that can slow us down in our work. Once we see and understand these things for the first time, our eyes are forever opened to seeing our work in a whole new light.

This is where we can begin to actively improve our efficiency as lawn mowing contractors. Searching for ways to save those precious minutes at each job, as we seek to solve each riddle which is taking our minutes from us. Each time we learn to improve any given situation that we come across in our work, then those new insights and efficiencies stay with us forever. We become permanently more efficient in our work from then on.

If we’ve decided to look to improve our efficiency on certain underperforming jobs, then we shouldn’t keep timing ourselves each time we do those jobs. Instead focus solely on ways to work smarter and not harder. We don’t become more efficient and better at what we do by running and rushing, we only become sloppy and we burn out our bodies quickly. Keep racking your brain of how to improve instead of keeping staring at a watch.

After a while, and after we have implemented changes to our work flow and practices, then we can time ourselves on those jobs again to see if we’ve improved, and by how much.

The beauty here is that if we have seen our flaws in some of our jobs, and if we have indeed improved our work practices to reduce our work time on those jobs, then those work improvements don’t just stay on those isolated jobs. Our increased work efficiency follows us to all of our jobs. Therefore if we are going to start timing ourselves again some months later after improvements, then we should do it again on all of our jobs.

We might just be surprised at what we see.

Price Increases

During our assessment of our work, and our jobs, and our fluctuating hourly rates, we will question all aspects of our situation. This includes asking ourselves whether any of those underperforming jobs are actually underpriced.

And the truth is that some of them, or maybe even all of them are underpriced too, in addition to any inefficiency that may have been in our work practices.

If we can honestly look at these underperforming jobs and compare them to other jobs in our rounds, or in comparison to what we know are correct priced jobs, and see and know that they are indeed underpriced, then we must increase prices.

We want to increase prices and increase efficiency together.

Increasing the price by $5.00 and decreasing the time taken to do the work by 5 minutes might be all it takes to bring a particular job back into territory that we would consider as an acceptable average hourly rate, or perhaps to exceed that average.

Sometimes we might need another price increase yet still to bring a particular job to an average hourly rate. We must each decide for ourselves what to do in these situations. We can elect to keep the job and plan to increase the price again in 12 or 18 months. If our round is full and the job is at the edge of our territory then we might consider letting the job go if it is too underpriced.

Letting Go Of Customers

We will find during these reviews, and at other times when we're keeping an eye on our work and pricing, that there are some jobs which are a lot more out of whack than others. The hourly rate on this one job is shown to be appallingly low compared to our other jobs. We've tried to increase the efficiency of our work, and we may have saved some time, but it's still not good enough. We've considered raising the price by $5.00, and while this might be good when combined with the increased efficiency, it won't be enough to cover what we want to make per hour at minimum.

Our problem in this situation is that we underpriced our quote for the job, maybe by a lot. In addition to this the job is taking longer than it should, for whatever reason is causing the extra time to be consumed. There is simply no way to make the job worthwhile, no matter what we might try.

In such situations we do have the option of speaking to the customer and telling them the situation, and saying that we need to raise the price by $10.00, or maybe even more. If we choose this path then we need to give the customer the option to get other quotes and to change contractors if they want to. We can't be childish in such a situation, we have to accept it, and part in peace.

Another way to increase a price by as much as $10.00 is to do it in 2 lots, $5.00 each time, 12 months apart.

Alternatively, we might want to just remove the work from our rounds, and let the customer go.

Whatever path we choose in this situation is our own individually for us to make based on our best wisdom of the situation. One thing to consider whenever cancelling a job directly or doing something which may result in a cancellation, is to wait until after winter is over. Winter is hard enough, no need to make it worse for ourselves.

Ways To Save Time On Lawn Mowing Jobs

This is not the scope of this article, but to give a few examples:

  • mow lawns in a pattern that always brings you to the bin when the catcher needs emptying, so you never carry the grass catcher anywhere
  • taking the hand blower wherever you go with the mower saves time from another trip
  • a small yard with a single section can allow for 2 machines to be taken to the work site at a time, instead of one, 2 trips instead of 4
  • taking the invoice to the mailbox when walking past it with the last machine being used, can save us 1 minute on every job we do
  • if we use the line trimmer before lawn mowing, find out which perimeters don’t need trimming at all, and leave it to the mower to do the work
  • if we trim first and if the grass is in poor condition, then there is no need to blow paths clean before mowing commences
  • keep searching for ways yourself to save minutes on each job

The Unwinnable Fight And Finding Balance

Something else we discover and learn from timing our lawn mowing jobs, and by increasing our efficiency in our work, is that some jobs just take longer than others. Even if the lawns are the same size, even if a lawn twice the size takes less time to mow of a lawn half its size.

Realising this matures us as lawn mowing contractors, it gives us peace, and takes away worry we might have about underperforming jobs. Some jobs just take longer than others, it goes with the work that we do. When we accept this, our minds have peace, our work is enjoyable, and we remove worry from our thoughts.

Consider this too, that those few exceptionally well performing jobs are anomalies too. Those ones go in our favour, the other ones go out of our favour, yet both balance each other out to give us that perfect average hourly rate we want.

How’s that.

Conclusion

Timing our jobs is a powerful tool of truth to help us to improve our lawn mowing rounds in our own personal work practices and efficiency, and in showing us where we need to lift our prices too. It also teaches us peace, balance, and acceptance.

Here comes the warning.

We don’t want to be obsessing on timing our work all the time. It would consume us. It would waste our time. We would be fighting ourselves. Struggling to win a fight that cannot be won, as we continue to chase our own tails, instead of maturing to become proficient in what we do.

Timing jobs in our first year, or maybe 2 can be a waste of time, we are generally too inexperienced and inefficient in our work practices, and too naive in knowing what’s what. We’re already trying to learn and improve with each work day. Overwhelming ourselves with more pressure to do what we are already doing does not help us, it hinders us and it harms our right state of mind during this stressful period.

Timing our jobs after the first year or so can be the truth bomb we need to drop bad habits and get ourselves into gear to take our work seriously. Shock therapy, if you like.

Repeating a couple of years later can be a revitalising wake up call. One which might take us into the next level of improvement in our business at the perfect time.

After that, well you’re then a professional to decide what you do and don’t need to do in your own business. Your work efficiency should have improved incredibly over the years, and you should be able to adjust prices when necessary.

Personally I haven’t timed jobs for a very long time, maybe 15 to 20 years. Although I do sometimes quickly tally up the total income for a day and compare it to the time I’ve been out on the road. This gives me a rough estimate of hourly rate with drive time, just as a curiosity on my short drive home. For so long now I know, accept, and have peace with the fact that some jobs can be done more quickly than others, and some jobs can take a little longer. This is the nature of the work that we do. Just as we know some jobs are priced a little better and some a little worse. We see and accept balance amongst variables. This comes with maturity and experience, after we have honed our skills to efficiency, and provided our work is reasonably properly priced.

I still always have a keen eye to look for ways to increase efficiency at every single job I do, and I always monitor prices and adjust them as necessary. Sometimes too, I have to let a customer go if the work is underperforming for the price charged, if the discrepancy  is too great, and if I believe there is no way to fix whatever is causing the problem within a reasonable amount of time.

 
Start A Lawn Mowing Business In Australia
 
how to start a lawn mowing business in australia
all articles and images are © copyright
thelawnmowingman.com
 
 

how to start a lawn mowing business in australia